OAKEY MEADOWS STORM DRAIN, PHASE 2B

Project Type: Construction Management
Service Performed:
  • Construction Administration
  • Construction Observation Quality
  • Control Oversight
  • Monthly Pay Application Review
  • Overall Quality Assurance
  • RFI Response
  • Value Engineering Support
  • Constructability Review

GCW provided construction administration and quality control services for the
construction of: approximately 2,000 lf of Reinforced Concrete Box (RCB) storm
drain ranging in size from 7-ft by 4-ft to 7-ft by 6-ft, approximately 1,100 lf of 18-
inch to 38-inch by 60-inch Reinforced Concrete Pipe (RCP) storm drain mains
and laterals, approximately 1,600 lf of sewer line ranging from 4-inch to 8-inch,
miscellaneous waterline relocations and replacements, junction structures, and
transition structures and inlets. The project also incorporated the rehabilitation
and reconstruction of roadway improvements which included the installation
of sidewalk, curb and gutter, paving, path lighting, and landscape removal/
repair. The project included multi-jurisdictional coordination with City of Las
Vegas, Las Vegas Valley Water District, Clark County Regional Flood Control
District and Nevada Department of Transportation. GCW oversaw quality control
and performed construction administration, monthly pay application review, and
overall quality assurance for the project.