Centennial Parkway Channel West – Grand Teton Storm Drain

Awards: 2015 APWA Project of the Year
Client: City of Las Vegas
Service Performed:
  • Hydrology/Hydraulics
  • Storm Drain
  • Structural Engineering
  • Utility Coordination
  • Cost Estimates
  • Specifications

The project consisted of final design for CCRFCD Master Plan facilities including 2,500 lf of 8-ft by 6-ft and 1,500 lf of 10-ft by 5-ft precast RCB storm drain, transition structures, 550 lf of 18-inch to 30-inch RCP and PVC storm drain, laterals and drop inlets. GCW determined design flow rates, hydraulic analysis, pavement replacement, relocation design and coordination of power, gas, telephone and water utilities. GCW also coordinated with RFCD, utilities and other consultants. GCW completed the design in five (5) months and worked closely with CLV and the contractor throughout the CMAR delivery process. The project completed a critical section of storm drain system that protects developments that experienced severe flooding during the August 2013 flood event.