Levi 2745 Zone Reservoir & 2860 Zone Pumping Station

Project Type: Water and Sewer
Construction Budget: $24,850,000
Client: Las Vegas Valley Water District
Service Performed:
  • Preparation of contract documents
  • Structural Design
  • Electrical Design
  • Survey
  • Pipeline Design
  • Reservoir Design
  • Pumping Station Design
  • Corrosion Design
  • Hydraulic/Surge Analyses
  • SCADA/Telemetry Design
  • Drainage Study and Designs
  • Offsite improvement Design

GCW performed the overall engineering design including survey, civil, structural,
and electrical engineering. Prepared contract documents, and will provide
construction related services for the construction of 20 million gallon, 2 bay buried
reinforced concrete reservoir (expandable to 30 MG) with appurtenant piping,
underground vaults, site work, electrical and telemetry equipment. Also included
a 26,000 GPM pumping station equipped with five 5,200 GPM pump units, pump
control room, disinfection facilities, off-site improvements, inlet and outlet piping, valve
vault structures, and appurtenances. Survey services included aerial and ground
topography, legal descriptions, etc.