Apex Surface Water System – Phase 2

GCW is providing planning and engineering services for the backbone infrastructure at the Apex Industrial Park to extend potable water service to this area. The project includes final design of a new pump station, water transmission pipeline, and two storage tanks. Additional elements include a surge tank, emergency generator, instrumentation and controls, and site security improvements. The Site 4 reservoir is a 1.5 MG above ground steel water storage tank (95-feet in diameter and 32-feet tall) with site improvements to allow for an additional 1.5 MG tank.